
PROJECT
Design and installation of a slurry backfill system in a Yukon mine.
OUR ROLE
Pumpaction supplied and set up a slurry backfill system using a 75 HP HSP 2180 Putzmeister piston pump.
The Pumpaction representative was involved throughout the plant design and equipment start-up process.

